EPIC Floor Finishing · Concrete
Commercial concrete floor sealing.
Polished and hard-troweled concrete takes one coat of EPIC without grinding. After that it's kept up with a mop or an auto scrubber and isn't buffed.
The floor
Getting concrete ready for EPIC.
Moisture test
EPIC's maker wants a slab on the ground tested for moisture first, since damp concrete can make a coating blister. New concrete has to cure at least 30 days.
Ground floors and overlays
Concrete that's been ground rough gets a primer first. So does a cement overlay, which is ground before it's coated.
Stockrooms and warehouses
The maker gives no drying time for wheels, so ask Dave about a floor where pallet jacks or forklifts run. For bare concrete in a shop or a warehouse, Dave also puts down shop floor coatings.
Common Questions
Questions about sealing concrete.
Can EPIC go over dyed concrete?
Yes, the maker lists dyed concrete along with plain gray and polished concrete.
Does motor oil stain it?
Used motor oil passed the maker's 4-hour spot test on both the gloss and the matte.
What does it cost?
Dave prices it at the site visit, after he has measured the concrete and looked it over.
More answers
More Floors
Other floors EPIC goes over.
VCT, LVT, sheet vinyl and linoleum, waxed or not.
More on VCT and vinyl TerrazzoCement-based or epoxy terrazzo, waxed or polished, usually without grinding.
More on terrazzo Tile and groutCeramic, porcelain and stone tile. Coated grout lines clean up and hold less odor.
More on tile and groutGet a quote
Tell Dave about the floor.
Dave prices EPIC after he comes out to measure the floor. If you already have a quote from another company, he'll look it over to make sure you're getting what you pay for.
| Monday to Saturday | 8 AM to 6 PM |
|---|---|
| Sunday | Closed |
Or email dave@allamericanconcretecoating.com